About > Work Experience
- System Control Migration PLC Governor #1 PLTA Mendalan
- Retrofitting and Remotisasi System Control PLTA Cikalong
- System Control Migration PLC Governor #3 PLTA Giringan
- Retrofitting Total System Main Control, Governor dan AVR PLTA Tanggari I
- Retrofitting System Main Control, AVR dan Governor Hydraulic PLTA Selorejo
- Retrofitting Governor Control System Unit 2 dan Unit 4 PLTA Singkarak
- Upgrading Modicon 984 to Quantum PLC di PLTGU Grati
- Retrofitting System Control Bendung Gerak Gambarsari (Serayu)
- System Control Migration PLC Governor #2 PLTA Mendalan
- Designing and Engineering Total Control Migration – PLTA Wlingi dan PLTA Sutami
- Softstarter Installment PLTA Sutami
- Repair of DAS (Data Acquisition System) PLTP Kamojang
- EPC Electrical, Mechanical, Hydrolic and Control Instrument PLTA Taluda’a
- Retrofitting Total System Control PLTD Pesanggaran
- Retrofitting Main Control PLC PLTA Giringan – UBP Brantas
- Retrofitting Total Main Control and Governor PLTA Bakaru – South Sulawesi
- Retrofitting Governor Control PLTA Batutegi unit 1
- Retrofitting Governor Control at PLTA Singkarak unit 3
- Retrofiting Governor Control PLTA Tes Unit 4, 5, 6, 7 – Bengkulu
- Retrofitting Total Control PLTM Sawito Unit 1, dan 2
- Retrofitting TrashRack DAM PLTA Bakaru
- EPC Telemetry Expansion for Rain fall, Water Level, and Public Announcement – PLTA Bakaru
- Retrofitting Governor Control PLTM Lokomboro
- Retrofitting AVR PLTM Pinang Awam
- Installment of Energy Management Sistem – Graha Niaga
- Retrofitting Governor Control PLTM Rante Balla
- Retrofitting Total System Control, AVR, dan Hydrolic Governor PLTA Tes 1 & 2, PLN Bengkulu
- Retrofitting Total System Control PLTA Tes 5 & 6
- Retrofitting Total System Control, AVR and Hydraulic Governor PLTM Wamena – Papua
- EPC Control System & Governor PLTM (Mikro Hydro Power Generation ) Bolontio – Gorontalo - Sulawesi
- Retrofitting Total Control System, AVR, dan Hydrolic Governor PLTA Tes 1 & 2, PLN Bengkulu
- Retrofitting Total Control System PLTA Tes 5 & 6
- Retrofit Total Control System, AVR, dan Hydrolic Governor PLTM Wamena – Papua
- Retrofitting Total Control System at HydroPower Plant – Sempor , Central Java
- Retrofitting PLC-based Governor Control and AVR/FCR Unit 1, 2, and 3 at Sudirman HydroPower Plant
- EPC Control System & Governor at new PLTA (Hydro Power Generation ) Bolontio – Gorontalo – Sulawesi
- Installment and Development of Thermal Efficiency Monitoring System at Steam Power Generation – Pesanggaran – Bali
- Installment and Development Thermal Efficiency Monitoring System at Steam Power Generation – Perak – East Java.
- Retrofitting Governor Control System at PLTA Singkarak unit 1
- EPC Total Control System new Hydro Power Generation ; Siteki & Plumbungan – IP UBP Mrica, Central Java
- Retrofitting Total SCADA Unit 1 & 2 ; Geo Thermal Power Generation – IP UBP Kamojang, West Java
- Retrofitting SCADA HMI ; Geo Thermal Power Generation – IP UBP Drajat, West Java
- Installment and Development of Thermal Efficiency Monitoring System ; Steam Power Generation – IP UBP Gilimanuk, Bali
- Installment and Development of SCADA System Diesel Power Generation ; Kaltim Daya Mandiri, Kaltim
- Installment and Development CEMS ( Chemical Emission Monitoring System ) ; Kratatau Steel, Cilegon
- Retrofitting SCADA System ; Chocolate Processing Machine M & M plant, Makasar
- Installment and Development of SCADA System; Power Substation at Central Pertiwi Bahari, Lampung
- Retrofitting Total Control System Mini Hydropower Generation; PLN Sektor Bakaru Sawito, South Sulawesi
- Retrofitting Telemetry system HydroPower Generation ; PLN Sektor Bakaru , South Sulawesi
- Installment of Baghouse Control System Smelting plant ; Kobatin, Bangka
- EPC Telemetry Musi Hydropower Generation ; PLN Sektor Bengkulu, Bengkulu
- Retrofitting SCADA/HMI Hydropower Generation BATUTEGI ; PLN Sektor Lampung, Lampung
- Retrofitting Governor Control Gas Turbine Power Generation Unit 2 Cilacap – IP UBP Cilacap, Central Java
- Retrofitting SCADA HMI Geothermal Power Generation Gunung Salak – IP UBP Gunung Salak, West Java
- Retrofitting HMI Gypsum Process machinery ; PT Jaya Boral Cilegon – West java
- Retrofitting Control System Pulp Machinery mo 8 APP ; Riau, Sumatra
- Retrofitting Governor Control Hydropower Generation ; IP UBP Jelok, Central Java
- EPC SCADA for remote operation 10 Hydropower at Banjarnegara ; IP UBP Mrica, Central Java
- Retrofitting Control System HydroPower Generation TES ; PLN Sektor Bengkulu, Bengkulu
- Retrofitting Coal Handling Control System Steam Power Generation ; IP UBP Suralaya
- Retrofitting SCADA system Hydro Power Generation ; IP UBP Garung, Central Java
- Retrofitting SCADA system Hydro Power Generation ; IP UBP Wonogiri, Central Java
- Retrofitting SCADA system Hydro Power Generation ; IP UBP Wadaslintang, Central Java
- Retrofitting SCADA system Hydro Power Generation ; IP UBP Tulis, Central Java
- Retrofitting SCADA system Hydro Power Generation ; IP UBP Ketenger, Central Java
- Retrofitting SCADA system Hydro Power Generation Unit 3 ; IP UBP Timo, Central Java
- Development of SCADA Substation ; PLN Bangka, Bangka
- Retrofitting Governor Control Gas Turbine Power Generation Unit 1 Cilacap – IP UBP Cilacap, Central java
- Retrofitting SCADA system Hydro Power Generation Unit 2 ; IP UBP Timo, Central Java
- Development of SCADA Power Substation ; PLN Lampung, Lampung
- Installment and Development SCADA at PT Perfetti Van Melle ( Mentos )
- Retrofitting Process Control & HMI at Chocolate division PT. Mayora.
- RetrofittingTelemetry at DAM Saguling ; IP UBP Saguling, West Java
- Retrofitting Control Test Brake Pad Machinery ; PT. Lintas Aman Tormos, Bogor
- Installment and Development SCADA – Power Transmission ; PLN CAWANG, Jakarta
- Retrofitting SCADA system Hydro Power Generation Unit 1 ; IP UBP Timo, Central Java
- Retrofitting Control system Hydropower generation ; IP UBP Lamajan
- Development of SCADA Power Substation ; PLN Samarinda, Kalimantan Timur
- Retrofitting Control system at PLTA Plengan ; IP UBP Plengan
- EPC Telemetry System HydroPower Tes ; Kitsumbagsel, Palembang
- Retrofitting Telemetry System Hydropower Saguling ; IP UBP Saguling
- Installment and Development of REDUNDANT SCADA Hydropower Saguling ; IP UBP Saguling
- Retrofitting Control System Oil & Gas Natuna Kakap platform ; PT. Star Energy
- Retrofitting Bagging plastic machinery Merak Plant ; PT. Kekar Plastindo.
- Development of Warning system Hydropower PBS ; IP UBP Mrica, West Java
- Development of SCADA system Hydropower Ketenger ; IP UBP Mrica, West Java
- Process monitoring for tin smelter at Kobatin , Bangka
- Baghouse control for tin smelter at Kobatin, Bangka
- Design and Development of Control Rectifier 16000A, 48VDC output for PERTAMINA PLAJU
- Monitoring dynamic weighing system for Inalum, North Sumatra
- Vibration monitoring system steam power generation ; IP UBP Tanjung Priok
- Development of an extension for SCADA Power Substation ; PLN Samarinda, East Kalimantan
- Development of an extension for SCADA Power Substation ; PLN Balikpapan, East Kalimantan
- Automatic system controller for forging – foundry ; PT Timah, Bangka
- Fire alarm system steam power generation ; IP UBP Tanjung Priok
- Control and Monitoring carbon shaking machinery for Inalum, North Sumatra
- Retrofitting Telemetry Hydropower Besai ; PLN Sektor Lampung,
- Monitoring and controlling Oxygen level tambak udang at Tangerang at PT. Mega Kencana Biru.
- Development of secondary SCADA for cooper smelter plant at Gresik, East Java
- Upgrade PLC at Bayer Urethene, Cilegon
- Retrofitting Flare gas ignition controller Oil & Gas Kaji ; PT Exspan
- Dam Control system for startup turbine Hydropower Jelok ; IP UBP Mrica, Central Java
- Development of SCADA Power substation ; PLN Purwokerto.
- Development of Process monitoring tin smelter ; PT Kobatin – Bangka
- Development of SCADA system ship loading ; PT. TB Bukit Asam Tarahan, Lampung
- Retrofitting PLC ; PT. Freeport – Papua.
- Retrofitting Control System, and Governor control Hydropower Besai ; PLN Sektor Lampung
- Development of Control system water fountain Bundaran HI ; Sudirman, Jakarta.
- Development of induction furnace control system ; PT. Timah Industri, Bangka.
- Upgrading Citect SCADA software Cement steam power plant ; PT. Indocement, West Java
- Development of SCADA system Power Substation ; PLN Pasuruan, East Java.
- Development of SCADA system Oil & Gas kaji ; PT Exspan
- Design and development of control system for Crystalizer ; PT Bimoli, Jakarta
- Retrofitting control system for plastic Coextruder ; PT. Supernova, Jakarta
- Develop Monitoring steam power generation ; IKPP - Serang.
- Retrofitting Building Automation System at Niaga Tower, Jakarta
- Retrofitting Control System HG removal ; PT Pertamina, Balongan West Java
- Remapping and Reprogramming installed PLC & HMI ; PT FreePort, Papua
- Development of RTU Monitoring ; IP UBP Saguling.
- Development of Power Management System ; PT. IndoSat .
- Repair of SCADA Bili – Bili Dam ; PT PLN Wilayah Sulserbar
- Repair of Scada batching system cream detergent ; PT. Ancol Terang, Tangerang
- Development of SCADA Power Substation ; PLN – Batam
- Development of SCADA Tin process ; PT. Kobatin tin process, Bangka
- Retrofitting DC to DC converter steam Power Generation ; IP UBP Suralaya.
- Installment of Variable Speed Drive ; PT Cabot, Cilegon, West Java
- Development of Control PLC Roomelag bottling & filling ; PT Bimoli – Surabaya.
- Retrofit Control System Die Casting ; PT. Timah, Bangka
- Programming existing Mitsubishi PLC for Die Casting for PT. Timah.
- Programming Existing PLC to communicate with Yokogawa DCS at Gulf Natuna platform
- Programming PLC & MMI for Handil Air Injection Pilot Project, at PT.Total Indonesie
- Oil & Gas Company Pinhole detection monitoring for Krakatau steel.
- Retrofitting Burner system at Exspan Oil Sumatra
- Design and Development of Booster Station SCADA system at Exspan Sumatera Oil Company
- Retrofitting PLC & MMI Casting Machine ; Dynacast, Singapore
- Upgrading SCADA Crystalizer ; Bimoli, Jakarta
- Development and Programming of PLC Rommelag Bottling & filling machine ; Bimoli, Jakarta.
- Development of Control System Oil & Gas Kaji plant ; PT Expans Sumatra.
- Development of Telemetry Flood warning system at Citarum River, West Java
- Upgrading MMI ; BHP steel, Cilegon
- Upgrading HMI Gypsum machinery ; PT. Boral Petro Jaya, Cilegon
- Upgrading HMI coal mining Senakin ; BHP, East Kalimantan
- Design and development of diesel emergency seawater pump ; IP UBP Suralaya.
- Development of Control System diesel emergency seawater pump ; IP UBP Suralaya.
- Upgrading Factory Link MMI Oil & Gas Marathon Natuna ; Gulf
- Upgrading Factory Link MMI Steam Power Generation ; China Light Power, Hongkong
- Develop Intauch MMI Oil & Gas Minas Plant, PT Caltex, Riau Sumatra
- Fabricating of Building Management System control panel ; PT. Telkom Jember, East Java
- Development of current and voltage monitor Exciter Geo Thermal Power Generation ; IP UBP Kamojang
- Retrofitting Burner management system controller ; PT. Expan, East Kalimantan
- Fixing Citect MMI Peroxide Chemical plant ; PT. Risyad Brazalli, Cikarang
- Development of Control System Dredging system ; PT. Timah , Bangka.
- Development of ESC Gas Power Generation ; PT. Exspan Sumatra–Oil company.
- Development of Container tracking system ; Perum – Pelabuhan II, Tanjung Priok – North Jakarta.
- Development of Lime stone processing ; PT . Calsindo Perkasa, Cibinong West Java
- Development of load shading 9 generators ; PT. Control Ragam – Cikarang
- Development of rectifier 0-24VDC, 0-2000A ; PT. Supernova, Jakarta
- Retrofitting Control System plastic cutting & sealing machinery ; PT. Supernova – Jakarta. 7.
- Retrofitting DCC Telemetry HydroPower Generation Saguling ; IP UBP Saguling, West Java
- Development of control system bottling & filling machine ; Bimoli, Jakarta
- Development of Control System Arun Aromatic Chemical plant ; PT. Humpuss, Jakarta
- Development of SCADA Power substation ; PLN – Bali.
- Development of Control System pulp & paper machinery ; PT. Papirus Sakti , Bandung .
- Development of ESC oil & gas ; PT. EXSPAN Sumatra.
- Development of Control System Raw Mill Cement plant ; PT. Semen Cibinong, West Java.
- Development of Control rectifier 0 – 5000A, 24Vdc ; PT. Pelat Timah Nusantara , Cilegon
- Development of Control System ; CSR plaster board factory, Cikarang.
- Development of Control Load shading five generator ; PT. WAVIN, Cikarang
- Development of Control rectifier 0-2000 ; PT. Uniflex Kemas Indah – Cikarang
- Development of Control System bottling & filling machine ; Bimoli, Jakarta
- Development of Central Monitoring ; PT. Latinusa, Cilegon West Java.
- Development of Control plating ; CEC- Elektrindo – Jakarta
- Development of Control rectifier 0-2000 A, 15 Vdc, PT. CEC Elektrindo, Jakarta
- Retrofitting of Control Rectifier for PT. PADI KOMPONEN NATIONAL GOBEL
- Retrofitting of Control ASH & DUSH Steam Power Generation ; IP UBP Suralaya.
- Development of MMI Building Automation System Monitoring ; Perum Peruri - Karawang
- Development of HMI Process control monitoring system ; ARCO CHEMICAL, Cilegon .
- Designing, programming, and installment of control machinery for Winding Machine PT. CEC Elektrindo -Jakarta. PLC used Modicon
- Development of RTU- Well Test Controller and Gathering Station Monitor Area 5 and 6 Oil & Gas Duri Plant ; PT. Caltex, Riau
- Development of Building Automation System ; PT. DHARMALA INTILAND, Jakarta.
- Development of Fire Alarm system for ; PT. DHARMALA INTILAND, Jakarta.
- Development of Telemetry Well Test Controller and Gathering Station Monitor Oil & Gas Duri Plant ; PT Caltex, Riau.
- Development of Control Boiler ; PT. UNISIA, Jakarta
- Development of Control Boiler ; Cikini Hospital, Jakarta